Receiving and unpacking – Nortec SETC Outdoor User Manual

Page 5

Advertising
background image

Introduction | 2

Receiving and Unpacking

1 Check packing slip to ensure ALL material has been delivered.
2 All material shortages are to be reported to Nortec within 48 hours from receipt of goods.

Nortec assumes no responsibility for any material shortages beyond this period.

3 Inspect shipment for damage and note damages on shipping waybill accordingly.
4 After unpacking, inspect equipment for damage and if damage is found, notify the shipper

promptly.

5 All Nortec products are shipped on an FOB factory basis. Any and all damage, breakage or

loss claims are to be made directly to the shipping company.

Before Installation

1 Ensure that available voltage and phase corresponds with humidifier voltage and phase as

indicated on humidifier’s specification label.

2 If steam supply is from a Medium or High Pressure boiler ensure supply steam line includes

a relief valve to prevent supply pressure from exceeding 15 psig.

3 Ensure means for returning boiler steam condensate to boiler at atmospheric pressure are

available.

4 Ensure sufficient clearances will be available as described in Location 9.
5 Ensure steam lines can be routed to distributor, SAM-e manifold, or blower pack as

described in Steam Lines and Condensate Returns on page 15.

6 Report any discrepancy immediately to the site engineer.

Figure 1: SETC Outdoor Specification Label Location

Note: A steam valve, actuator, and wye strainer are shipped along with the SETC/P

humidifier but in separate small boxes.

Advertising