Operation – Nortec MES2 User Manual
Page 26
Advertising

23 | Operation
Operation
24 User Interface
24 LED Status Lights
24 On/Off Drain Switch
25 Humidifier Configuration
26 Capacity Adjustment
26 Mains Voltage Select (J1 to J6)
26 High Water Sensor Voltage (J8 and J9)
26 On/Off or Modulating Control (J10)
26 Modulation Offset (J13)
27 Ground Fault Interrupt (GFI) (J15)
27 Modbus Control (J26)
27 Modbus Configuration
27 Modbus Addresses
30 Start Up Procedure
Advertising