25 | Operation

Humidifier Configuration

The MES2 is factory configured to operate under most conditions without the need for any
changes to its configuration. If required several settings can be made using jumpers on the
MES2’s control board. The output of the MES2 can also be reduced by using a potentiometer
on the MES2’s control board. See Figure 21: MES2 Control Board Jumpers for location of
jumpers and the capacity adjustment potentiometer.

Note: Nortec recommends not making any configuration changes unless they are required and

that any changes to the MES2’s settings be performed by a qualified technician.















Figure 21: MES2 Control Board Jumpers

Table 6: MES2 Control Board Jumpers

Jumper

Installed

Removed

J1 550-600

V

No Affect

J2 440-480

V

No Affect

J3 380-415

V

No Affect

J4 277V

No Affect

J5 220-240

V

No Affect

J6 200-208

V

No Affect

J8

HWS setting for 380-600 V

No Affect

J9

HWS setting for 200-277 V

No Affect

J10 On/Off

Operation

Modulating Operation

J13

2-10 VDC or 4-20 mA* modulation

0-10 VDC or 0-20 mA* modulation

J15

GFI on, power relay off during drain

GFI off power relay on during drain

J26

Modbus control enabled

Modbus Control disabled

P11 (2-3)

Self test at start up disabled

Self test at start up enabled

* mA modulation control requires a 500 ohm resistor installed between pins 1-2 of P5 control signal input terminal (see Figure 18:

Control Wiring.

Modulation
Offset & GFI

J13 & J15

On/Off or
Modulating

J10

Potentiometer
Capacity
Adjustment

J1 - J6

Mains

Voltage

Select

J8 & J9
HWS Voltage

Modbus
Control

J26

P11

P11 (2-3)
Disable Self Test