CAUTION: Use only new,

black iron or steel pipe. Inter-

nally-tinned copper tubing may

be used in certain areas. Check

your local codes. Use pipe of

1/2" diameter or greater to allow

proper gas volume to log set. If

pipe is too small, undue loss of

volume will occur.

Installation must include a equipment shutoff

valve, union, and plugged 1/8" NPT tap. Locate

NPT tap within reach for test gauge hook up.

NPT tap must be upstream from log set (see

Figure 4).
IMPORTANT:

Install equipment shutoff valve

in an accessible location. The equipment shutoff

valve is for turning on or shutting off the gas to

the appliance.

INSTALLATION

Continued

Figure 4 - Gas Connection

* Purchase the optional CSA design-certified

equipment shutoff valve from your dealer. See

Accessories, page 18.
** Minimum inlet pressure for purpose of input

adjustment.

Apply pipe joint sealant lightly to male NPT

threads. This will prevent excess sealant from

going into pipe. Excess sealant in pipe could result

in a clogged burner injector.

WARNING: Use pipe joint

sealant that is resistant to liquid

petroleum (LP) gas.

We recommend that you install a sediment trap in

supply line as shown in Figure 4. Locate sediment

trap where it is within reach for cleaning. Install in

piping system between fuel supply and appliance.

Locate sediment trap where trapped matter is not

likely to freeze. A sediment trap traps moisture and

contaminants. This keeps them from going into log

set controls. If sediment trap is not installed or is

installed wrong, log set may not run properly.

CHECKING GAS CONNECTIONS

WARNING: Test all gas piping

and connections, internal and

external to unit, for leaks after

installing or servicing. Correct

all leaks at once.

WARNING: Never use an open

flame to check for a leak. Apply

a noncorrosive leak detection

fluid to all joints. Bubbles form-

ing show a leak. Correct all leaks

at once.

PRESSURE TESTING GAS SUPPLY
PIPING SYSTEM
Test Pressures In Excess Of 1/2 PSIG
(3.5 kPa)
1. Disconnect log set and its individual equipment

shutoff valve from gas supply piping system.

2. Cap off open end of gas pipe where equipment

shutoff valve was connected.

3. Pressurize supply piping system by either us-

ing compressed air or opening main gas valve

located on or near gas meter.

4. Check all joints of gas supply piping system.

Apply noncorrosive leak detection fluid to gas

joints. Bubbles forming show a leak.

5. Correct all leaks at once.
6. Reconnect log set and equipment shutoff

valve to gas supply. Check reconnected fit-

tings for leaks.

3" Minimum

Sediment Trap

From Gas Meter
(5" W.C.** to
10.5" W.C.
Pressure)

CSA Design-Certified
Equipment Shutoff Valve
With 1/8" NPT Tap*

Approved Flexible Gas Hose (if
allowed by local codes)

Tee Joint

Pipe Nipple

Cap