002 flex action field finisher, Brush instructions, Accessories – Smithco Super Star 42-00x (sn 4602 – 4660/12588 – 12627) Parts & Service Manual User Manual

Page 109: With

Advertising
background image

107

Accessories

43-002 FLEX ACTION FIELD FINISHER

WITH

BRUSH INSTRUCTIONS

ASSEMBLY INSTRUCTIONS

1. Install flail bar strap (Ref 20) to center of mounting bar (Ref 19) with chain on top of flail bar strap and

mounting bar bent away from you. Apply a light coat of lubricant to overall length of mounting bar.

2. Install one rasp flail (Ref 16) with knobby side down adjacent to sides of flail bar strap (Ref 20). Now

install a flat washer (Ref 18) so it sits adjacent with the outside of the rasp flail. Continue to install flails
with knobby sides down with washers between until you have 16 flails and washers on each side of bar
strap. Force all flails tightly toward bar strap.

3. After all 32 flails have been installed, place one spacer (Ref 17) to each end of mounting bar adjacent to

washer.

4. Install leveler bar (Ref 9) to mounting bar, with curved leveler bar resting on top on the smooth sides of

flails. If all flails and washers do not fit snugly at this time, remove leveler bar and install enough machine
bushings to ensure a snug fit. Then reinstall leveler bar.

5. Lay the frame (Ref 6) on the floor or bench with welded tabs facing up. Install ends of assembled mounting

bar, with knobby sides of flails up, into welded tabs on each end of frame and secure with

1

/

8

x 1 cotter

pin.

6. Install flail bar strap (Ref 20) to center tab on frame with

3

/

8

-16 x 1 bolt and

3

/

8

-16 center lock nut. Loose

fit is required. Do not over tighten.

7. Flip assembly over so knobby sides of flails are now facing down. Install hitch (Ref 25) to frame with clevis

pin (Ref 3) and cotter pin (Ref 24). The hitch should be attached to the frame as shown.

8. Install bar strap chain over welded pin on frame. Install leveler bar chain on to pin and secure in place with

bridge pin. Use last bridge pin and clevis pin to hitch field finisher to your machine.

9. Add extension arms (Refs 4 & 22) to rake lift. Super Star - use the center hole and only (1)

3

/

8

-16 x 1

1

/

4

bolt per arm. Supreme & Super Rake(see sidebar) - use the two outside holes on the extension arms
and (2)

3

/

8

-16 x 1

1

/

4

bolts per arm. Hook lift chains to extension arms (Refs 4 & 22).

OPERATING INSTRUCTIONS

Running attachment with all flails down, flat on the surface, will provide a leveling function. Running attachment
partially raised and flails at a 20° - 40° angle in relation to the level surface, will provide a finishing function. The
flails increase down pressure for desired finish. Drive in wide circular patterns and increase or decrease ground
speed to achieve desired finish.

BRUSH ASSEMBLY

1. Place the brush (Ref 15) into the brush track (Ref 14). Place the brush channel (Ref 13) between the brush

track and the mounting brackets. Now bolt the mounting brackets (Ref 10) to the brush track using the

1

/

4

-20 x

3

/

4

bolts and

1

/

4

-20 flange whiz-lock nuts (Ref 12).

2. Mount the brush assembly to the frame using the (4)

1

/

4

-20 x 2

1

/

2

bolts and

1

/

4

-20 flange whiz-lock nuts

(Ref 11).

Advertising