Installation, Continued – Desa FPVF33NR User Manual

Page 13

Advertising
background image

105270-01G

For more information, visit www.desatech.com

For more information, visit www.desatech.com

13

13

INSTALLATION

Installing Gas Piping to Fireplace Location (Cont.)

Connecting Fireplace to Gas Supply

Figure 22 - Gas Connection

* Purchase the optional CSA design-certified equipment shutoff
valve from your dealer. See Accessories, pages 34 and 35.

** Minimum inlet pressure for purpose of input adjustment.

Installation must include an equipment shutoff valve, union, and
plugged 1/8" NPT tap. Locate NPT tap within reach for test gauge
hook up. NPT tap must be upstream from fireplace (see Figure 22).

IMPORTANT:

Install equipment shutoff valve in an accessible

location. The equipment shutoff valve is for turning on or shutting
off the gas to the appliance.

Check your building codes for any special requirements for locating
equipment shutoff valve to fireplaces.

Apply pipe joint sealant lightly to male NPT threads. This will prevent
excess sealant from going into pipe. Excess sealant in pipe could
result in clogged fireplace valves. Never use sealant on flare threads.

WARNING: Use pipe joint sealant that is resistant

to liquid petroleum (LP) gas.

We recommend that you install a sediment trap in supply line as
shown in Figure 22. Locate sediment trap where it is within reach for
cleaning. Install in piping system between fuel supply and fireplace.
Locate sediment trap where trapped matter is not likely to freeze. A
sediment trap traps moisture and contaminants. This keeps them
from going into fireplace gas controls. If sediment trap is not
installed or is installed wrong, fireplace may not run properly.

Sediment Trap

CSA Design-Certified Equipment
Shutoff Valve With 1/8" NPT Tap*

3" Minimum

Cap Pipe Tee

Nipple Joint

Natural Gas
From Gas Meter
(5" W.C.** to 10.5" W.C.
Pressure)

Propane/LP
From External Regulator
(11" W.C.** to 14" W.C.
Pressure)

Installation Items Needed

• 5/16" hex socket wrench or nut-driver

• Phillips screwdriver

• sealant (resistant to propane/LP gas, not provided)

1.

Remove fireplace screen. Remove two screws that hold fire-
place screen in place for shipping. These screws are located
near top of screen. Discard screws. Lift fireplace screen up
and pull out to remove.

2.

Remove screws that attach log base assembly to fireplace (see
Figure 23, page 14). Carefully lift up log base assembly and
remove from fireplace (see Figure 23, page 14).

Note:

If adding the G8000A series brick liner accessory, install it

now. Follow instructions in G8000A accessory kit.

CONNECTING FIREPLACE TO GAS SUPPLY

CAUTION: Do not pick up log base assembly by

burner. This could damage burner. Only handle base
by grates.

3.

Route gas line (provided by installer) from equipment shutoff
valve to fireplace. Route flexible gas supply line through one
of the access holes.

CAUTION: Use only new, black iron or steel pipe.

Internally-tinned copper tubing may be used in cer-
tain areas. Check your local codes. Use pipe of 1/2"
diameter or greater to allow proper gas volume to
fireplace. If pipe is too small, undue loss of volume
will occur.

Figure 21 - External Regulator on Propane/LP Supply Tank with
Vent Pointing Down

External
Regulator

Vent
Pointing
Down

Propane/LP
Supply Tank

INSTALLATION

Continued

Advertising