Chapter 2 installation, Unpacking and inspection, Supplied materials – Verilink NetPath 2000 Product Manual User Manual

Page 15: Unpacking and inspection -1, Supplied materials -1, Chapter 2, "installation, Nstallation

Advertising
background image

I n s t a l l a t i o n

2-1

C

H A P T E R

2

C

HAPTER

2

I

NSTALLATION

This chapter describes the contents of your NetPath shipment and provides
information on connecting and installing the unit.

Unpacking and Inspection

The NetPath 2000is shipped in cardboard cartons with foam inserts for shock
and vibration protection. When your shipment arrives, inspect the shipping
container and contents, and compare all items with those on the packing list.

If the contents of the shipment are incomplete or if there is mechanical
damage or defect, notify Verilink. (Refer to Support from Verilink on page vi.)
If the shipping container or cushioning material is damaged, notify the carrier
and Verilink immediately and make a notation on the delivery receipt that the
container was damaged. (If possible, obtain the signature and name of the
person making delivery.) Retain the packaging material until the contents of
the shipment have been checked for completeness and the unit has been
checked both mechanically and electrically.

Supplied Materials

The NetPath 2000 ships with the following standard items:

NetPath 2000

External Power Supply

AC Power Cord

Cross-over CAT5 Ethernet Cable

The contents of the shipment are shown in Figure

Advertising