Visara CNA-8000 Planning Guide User Manual

Page 31

Advertising
background image

CNA-8000 Migration and Planning Guide

707156-002

3-5

DLSw Circuit Establishment

Let us start with the assumption that the XCA VTAM definition used by the CNA-8000
for use with the DLSw circuits has been activated, and that the PU2 platform is
communicating with the local DLSw router. This is a prerequisite for establishing a
DLSw circuit. Use the diagram illustrated below as a guide for the data flow diagram.


VTAM CNA-8000

DLSw

Router

PU


IP connection initiated by either side

--------------------------------------------------

Test

Can You Reach (exploratory)?

Test

<---------------------

----------------------------------------------------- --------------

+ Test Rsp

I Can Reach (exploratory)

+ Test Rsp

-------------------- ----------------------------------------------------- --------------
Can You Reach (Circuit Start)

Null XID

---------------------------------------------------- -------------

I

Can

Reach

(Circuit

Start)

-----------------------------------------------------
Reach

Ack

-----------------------------------------------------

Null XID

XID Frame

-------------------

-----------------------------------------------------

XID

XID Frame

XID

------------------- ----------------------------------------------------- --------------

XIDs

XIDs

XIDs

----------------

-------------------------------------------------- -----------


XID Recognized

SABME

CONTACT

SABME

------------------- ----------------------------------------------------- --------------
UA

CONTACTED

UA

------------------

---------------------------------------------------- -------------

SNA

Activation

IFRAMES

SNA Activation

------------------- ----------------------------------------------------- -----------------

IP

IP

Router

CNA-8000

IP

IP

SNA PU2

LLC

ESCON

VTAM

Switched
Node
Definitions

Advertising