Booting the switch, Checking before power-on, Powering on the switch – H3C Technologies H3C S5120 Series Switches User Manual
Page 48

40
Step5
Click Properties in the HyperTerminal window to enter the Switch Properties dialog box. Click the
Settings tab, set the emulation to VT100, and then click OK.
Figure 51 Set terminal emulation in Switch Properties dialog box
Booting the switch
Checking before power-on
Before powering on the switch, verify that:
•
The power cord is properly connected.
•
The power supply voltage meets the requirement of the switch.
•
The console cable is properly connected; the terminal or PC used for configuration has been started;
and the configuration parameters have been set.
Powering on the switch
The S5120-SI switches have the same Boot ROM display style. This document uses the Boot ROM output
information on the S5120-28P-SI as an example:
Starting......
************************************************************************
* *
* H3C S5120-28P-SI BOOTROM, Version 135 *