Installing the firewall in a 19-inch rack, Installing cage nuts to the rack – H3C Technologies H3C SecPath F5000-A5 Firewall User Manual

Page 21

Advertising
background image

11

•

You have read "

Preparing for installation

" carefully and the installation site meets all the

requirements.

•

A 19-inch rack is ready for use.

•

The rack is sturdy and securely grounded.

•

There is sufficient clearance around the rack for heat dissipation and installation.

•

No debris exists inside or around the rack.

•

Choose a correct rack mounting position for the firewall. Make sure the heaviest device is placed at
the bottom of the rack.

•

The firewall is ready for installation and has been carried to a place near the installation site and
convenient for moving.

Installing the firewall in a 19-inch rack

To install the F5000-A5 in a 19-inch rack, mounting brackets and a rack shelf are needed.

Installing cage nuts to the rack

1.

Determine where to install the firewall in the rack, and then install a rack shelf to the rack.

2.

As shown in

Figure 4

, mark the positions of the cage nuts on the front rack posts by using a front

mounting bracket.

Figure 4 Marking the positions of the cage nuts

3.

As shown in

Figure 5

, install the cage nuts to the marked positions on the rack posts.

Advertising