9 bore milling (cycle 208, din/iso: g208), Cycle run – HEIDENHAIN TNC 320 (340 55x-05) Cycle programming User Manual

Page 83

Advertising
background image

HEIDENHAIN TNC 320

83

3.9 BORE MILLING (Cy

c

le 208, DIN/ISO: G208)

3.9 BORE MILLING (Cycle 208,

DIN/ISO: G208)

Cycle run

1

The TNC positions the tool in the spindle axis at rapid traverse
FMAX to the programmed set-up clearance above the workpiece
surface and then moves the tool to the bore hole circumference on
a rounded arc (if enough space is available).

2

The tool mills in a helix from the current position to the first
plunging depth at the programmed feed rate F.

3

When the drilling depth is reached, the TNC once again traverses
a full circle to remove the material remaining after the initial
plunge.

4

The TNC then positions the tool at the center of the hole again.

5

Finally the TNC returns to the set-up clearance at FMAX. If
programmed, the tool moves to the 2nd set-up clearance at
FMAX.

Advertising