4 scope of delivery – SMA SC 500CP-10-JP Installation Manual User Manual
Page 17

SMA Solar Technology AG
4 Scope of Delivery
Installation Manual
SCCP-JP-IA-A4-en-12
17
4 Scope of Delivery
Check the scope of delivery for completeness and any externally visible damage. Contact your distributor if the scope of
delivery is incomplete or damaged.
Scope of Delivery of the Inverter
Figure 3: Components included in the scope of delivery of the inverter
Position
Quantity
Designation
A
1
Sunny Central
B
1
Ventilation plate
C
5
Kick plate
D
1
LV/HRC fuse handle*
* For DC fuse option
E
1
Non-woven abrasive
F
1
Desiccant bag
G
68
Screw
H
68
Nut
I
136
Fender washer
K
136
Spring washer
L
80
Cable tie
M
1
Cable support sleeve 15 mm to 16 mm
N
1
Cable support sleeve 17 mm
O
5
Cable support sleeves 9.5 mm to 13 mm
P
1
Touch-up stick RAL 7004
Q
1
Touch-up stick RAL 9016
R
1
Installation manual, operating manual, circuit diagram, maintenance report
Position of the LV/HRC fuse handle
With the DC fuse option, the LV/HRC fuse handle is located on the inside of the right door of the interface cabinet.