2 inspection point, 1 inspection while the power is off – Epson G3 Series User Manual

Page 79

Advertising
background image

Maintenance 2. General Maintenance

G3 Rev.1

69

2.2 Inspection Point

2.2.1 Inspection While the Power is OFF

(Manipulator is not operating)

Inspection Point

Inspection Place

Daily Monthly Quarterly Biannual Annual

End effector mounting bolts

Manipulator mounting bolts

Each arm locking bolts

Bolts/screws around shaft

Check looseness or backlash of
bolts/screws.
Tighten them if necessary.

(For the tightening torque, refer to
Maintenance: 2.4 Tightening
Hexagon Socket Head Cap Bolts
.)

Bolts/screws securing motors,
reduction gear units, etc.

External connectors on
Manipulator (on the connector
plates etc.)

Check looseness of connectors.
If the connectors are loosen, push it
securely or tighten.

Manipulator cable unit

External appearance of
Manipulator

Visually check for external defects.
Clean up if necessary.

External cables

Check for bends or improper
location. Repair or place it properly
if necessary.

Safeguard etc.

Check tension of timing belts.
Tighten it if necessary.

Inside of Arm #2

Grease conditions

Refer to Maintenance: 2.3 Greasing.

2.2.2 Inspection While the Power is ON (Manipulator is operating)

Inspection Point

Inspection Place

Daily Monthly Quarterly Biannual Annual

Check motion range

Each joint

Move the cables back and forth
lightly to check whether the cables
are disconnected.

External cables
(including cable unit of the
Manipulator)

Push each arm in MOTOR ON
status to check whether backlash
exists.

Each arm

Check whether unusual sound or
vibration occurs.

Whole

Measure the accuracy repeatedly by
a gauge.

Whole


Advertising