9 starting after first commissioning, Starting after first commissioning, Invert l oo e – SMA SI 3324 Installation User Manual

Page 81

Advertising
background image

SMA

Technologie AG

Commissioning

Installation Guide

SI3324/4248-14:SE2406

Page 81

8.9

Starting after First Commissioning

Once all parameters have been set, the Sunny Island 3324/4248 can be put into
operation.

Make sure that the message "To start press
<ENTER>" appears in the display by pressing
<ESC> until you access the main menu and then
pressing an arrow key until the "To start press
<ENTER>" message appears.

Press <ENTER> and the Sunny Island 3324/4248 will start.

A single beep will be heard.

The green LED on the control panel of the Sunny Island 3324/4248 will illuminate.

Once successfully started, a status overview
message appears in the display, showing the
current operating mode and the output power
(see also figure below):

To start

press <ENTER>

[¿¿¿¿¿¿_______]

Invert oo

[¿¿¿¿¿¿¿¿¿¿¿¿ ]

>Invert L oo E

Output power/charging power

Direction of energy

Load shedding relay

Generator status

Generator control

relay

Fault display

Operating mode

Load status

Advertising
This manual is related to the following products: