APOGEE FLN Set-Up

A Yaskawa America, Inc. representative is responsible for proper configuration of the Bypass for its primary application, while a Siemens
Building Technologies, Inc. representative is responsible for field panel programming to make use of the Bypass functionality in the
building automation system. As such, there must be coordination between the Yaskawa America and Siemens Building Technologies
representatives to ensure that the programming of the drive is consistent with the particular application requirements. After verifying that
the drive installation and wiring are correct, apply power to the drive. Table 1.1 below lists the parameters and their values required for
proper APOGEE FLN communication and control.

‹

Z1000 Bypass Parameter Settings for APOGEE FLN Communications

Table 1.1 - Drive Communication Parameter Settings

Parameter Number

Digital Operator Display

Settings for APOGEE FLN Communication

Z1-07

Reference Source

2: Serial Com

Z1-08

Run Source

2: Serial Com

Z3-02

Serial Comm Adr

Select the Bypass address

Z3-03

Serial Baud Rate

2: 4800 Baud

Z3-01

Protocol Select

2: P1

CAUTION

A Yaskawa representative should set the drive parameters to their appropriate values. Changes made
to the parameters other than what is listed in the table above can result in damaging the drive or
building equipment.

Programming The Z1000 Bypass For APOGEE FLN

Refer to the Z1000 Bypass User Manual, SIEPYAIZ1B01, for detailed information on using the Z1000 Operator.