Setting up an irrigation schedule – Irritrol Rain Dial R User Manual
Page 8
8
Controller Station Test Feature
Run a Station Test to check proper valve operation. The test cycle enables all valve stations
to operate in sequence, from 1–10 minutes.
1.
Set Function switch to
Run.
5.
Push Semi-Auto to
start watering cycle
(station 1).
2.
Turn Dial to Skip Days.
6.
Turn Dial to
Current Time.
3.
Push MANUAL button
once.
7.
Display shows current
time and what station is
running.
4.
Adjust run time.
A 2-minute test run is
set by default.
8.
Manual advances the
station sequence.
Setting Up an Irrigation Schedule
Setting the Current Time and Day
1.
Function switch to Set
Programs.
5.
Select the correct day*.
Display shows
day abbreviation.
2.
Turn Dial to Current
Time.
6.
Return Dial to Current
Time.
3.
Set current time.
Pay attention to “AM”
and “PM”.
7.
Function switch back
to Run.
4.
Turn Dial to Today.
*Note: If Odd/Even schedule or Monthly Water Budget is used,
the current day of the week is preset and cannot be changed.