Chapter 4, Chapter 4: hardware setup, Hardware setup – Lanner LEC-7106 User Manual

Page 16: Preparing the hardware installation

Advertising
background image

16

Hardware Setup

Chapter 4

Embedded and Industrial Computing

Note:

The motherboard can support up to 4 GB memory

capacity in maximum.

Chapter 4:

Hardware Setup

Preparing the Hardware Installation

To access some components and perform certain service

procedures, you must perform the following procedures

first.

WARNING: To reduce the risk of personal injury,

electric shock, or damage to the equipment,

remove the power cord to remove power from the

server. The front panel Power On/Standby button

does not completely shut off system power.

Portions of the power supply and some internal

circuitry remain active until AC power is removed.

Unpower the LEC-7106 and remove the power cord.

1.

Take off the 3 screws from the two sides of the LEC-

2.

7106 System.

Open the cover.

3.

Installing the System Memory

The motherboard supports DDR3 memory to meet the

higher bandwidth requirement of the latest operating

system and Internet applications. It comes with one

double data rate type three (DDR3) small outline dual in-

line memory module (SO-DIMM) socket.

Advertising