Energy Tech Laboratories New Yorker CL Series User Manual

Page 4

Advertising
background image



I. General Information

A.

INSPECT SHIPMENT carefully for any signs of

damage.

1. ALL EQUIPMENT is carefully manufactured,

inspected and packed. Our responsibility ceases
upon delivery of crated boiler to the carrier in good
condition.

2. ANY CLAIMS for damage or shortage in shipment

must be filed immediately against the carrier by
the consignee. No claims for variances from,
or shortage in orders, will be allowed by the
manufacturer unless presented within sixty (60)
days after receipt of goods.

B.

LOCATE BOILER in front of final position before

removing crate. See Figures 1A thru 1D.

1. LOCATE so that smoke pipe connection

to chimney will be short and direct. BOILER
IS SUITABLE FOR INSTALLATION ON
COMBUSTIBLE FLOOR. Boiler cannot be
installed on carpeting.

2. FOR BASEMENT INSTALLATION, provide a

solid base, such as a concrete pad, if floor is not

level, or if water may be encountered on floor
around boiler.

3. PROVIDE SERVICE CLEARANCE of at least 24”

on top of boiler for cleaning flueways. Provide at
least 24" on right side of boiler for removal of rear
tankless heater. Provide at least 24” clearance from
front jacket panel for servicing.

4. For minimum clearances to combustible materials.

See Figure 2.

C.

PROVIDE AIR SUPPLY AND VENTILATION to

accommodate proper combustion. If natural ventilation
is inadequate, provide a screened opening or duct from
the boiler room to the outside. The opening or duct
must be sized so the boiler input will not exceed 4,000
BTUH/Sq. In. of free area. If other air consuming
appliances are near the boiler, the air inlet should be
larger. Consult respective manufacturers.

Table of Contents

I. General Information .................................... 

II. Installation Instructions .............................. 8

III. Indirect Water Heater Piping .................... 2

IV. Operating & Service Instructions ............ 2

V. Maintenance and Service Instructions. ... 0

VI. Boiler Cleaning .......................................... 

Trouble Shooting

Carlin 0200 ............................................. 6

Riello 0 Series ....................................... 6

VII. Repair Parts .............................................7
VIII. Appendix
Low Water Cut Off ..................................5
Burner Specifications ............................6

Advertising
This manual is related to the following products: