5. installing electrode holder and work clamp, Piece – Hobart Welding Products STICKMATE OM-949 User Manual

Page 15

Advertising
background image

OM-949 Page 11

3-5. Installing Electrode Holder And Work Clamp

Ref. 802 251-A / 803 583-B

Y Turn Off unit and disconnect

input power before installing

electrode holder or work

clamp.

Removing Barrel From Elec-

trode Holder
1

Electrode Holder

2

Barrel

3

Access Hole

4

Set Screw

Loosen set screw through access

hole and slide barrel away from

electrode holder.
Installing Electrode Cable and

Barrel onto Electrode Holder
5

Electrode Cable From Unit

(Has Bare Conductors on

End)

6

Terminal Screw

Back out terminal screw from elec-

trode holder. Insert electrode cable

through barrel into end of electrode

holder and tighten terminal screw

securely.
Move barrel toward electrode hold-

er and tighten set screw to secure

barrel in place.
Installing Work Cable onto Work

Clamp
7

Work Clamp

8

Work Cable From Unit (Has

Ring Terminal on End)

9

Mounting Bolt

Route work cable through work

clamp as shown and install onto

mounting bolt using supplied hard-

ware.

6 mm

Tools Needed:

14 mm

1

4

2

3

6

5

8

9

7

PIECE

Advertising