HP XU800 User Manual

Page 121

Advertising
background image

121

6 Tests and Error Messages

Order in Which POST Tests Are Performed

85h

Memory size check is done. Displaying a soft error and checking for a password or
bypassing WINBIOS Setup.

86h

Password was checked. Performing any required programming before WINVIOS Setup.

87h

Programming before WINBIOS Setup has completed. Uncompressing the WINBIOS Setup
code and executing the AMIBIOS Setup or WINBIOS Setup utility.

88h

Returned from WINBIOS Setup and cleared the screen. Performing any necessary
programming after WINBIOS Setup.

89h

Programming after WINBIOS Setup has completed. Display the power on screen message.

8Bh

First screen message has been displayed. The <WAIT...> message is displayed.
Performing PS/2 mouse check and extended BIOS data area allocation check.

8Ch

Programming the WINBIOS Setup options.

8Dh

WINBIOS Setup options are programmed. Resetting the hard disk drive controller.

8Fh

Hard disk drive controller has been reset. Configuring the floppy disk drive controller.

91h

Floppy disk drive controller has been configured. Configuring the hard disk drive controller.

95h

Initializing the bus option ROMs from C800.

96h

Initializing before passing control to the adaptor ROM at C800.

97h

Initialization before the C800 adaptor ROM gains control has completed. The adaptor ROM
is then checked.

98h

Adaptor ROM has control and has now returned control to BIOS POST. Performing any
required processing after the option ROM returned control.

99h

Any initialization required after the option ROM test has completed. Configuring the timer
data area and printer bas address.

9Ah

Set the timer and printer bas address. Setting the RS-232 bas address.

9Bh

Returned after setting the RS-232 bas address. Performing any required initialization
before the co-processor test.

9Ch

Required initialization before the co-processor test is over. initializing the co-processor.

9Dh

Co-processor initialized. Performing any required initialization after the co-processor test.

9Eh

Initialization after the co-processor test is complete. Checking the extended keyboard IDn
and Num Lock key. Issuing the keyboard ID command.

Checkpoint

Code

POST Routine Description (Continued)

(A Check Point Code is NOT an error code or error number)

Advertising