Battery-backed write cache battery pack option – HP PROLIANT DL320 G6 User Manual

Page 42

Advertising
background image

Hardware options installation 42

7.

Install the cache module.

8.

Install the storage controller, if not installed ("

Storage controller option

" on page

40

).

9.

Install the capacitor pack.

10.

Route the cable. ("

BBWC battery pack or FBWC capacitor pack cabling to an optional controller

"

on page

51

)

11.

Install the access panel.

12.

Install the server into the rack.

13.

Power up the server (on page

16

).

Battery-backed write cache battery pack option

CAUTION:

To prevent a server malfunction or damage to the equipment, do not add or

remove the battery pack while an array capacity expansion, RAID level migration, or stripe
size migration is in progress.