Termination locations, Warning, A. vent termination minimum clearances – Heatiator Heatilator Evolution NEVO4236I NEVO3630I User Manual

Page 22

Advertising
background image

Heatilator • Evolution • 4065-114 Rev. o • 11/11

22

A. Vent Termination Minimum Clearances

Figure 6.1

Minimum Height From Roof To Lowest Discharge

Opening

Horizontal
overhang

12

X

20 in.

(508 mm)

Lowest

Discharge

Opening

Termination

Cap

Roof Pitch
is X / 12

Vertical
wall

H (min.) - Minimum height
from roof to lowest
discharge opening.

24 in. min.

(610 mm)

Roof Pitch

H (Min.) Ft.

Roof Pitch

H (Min.) Ft.

Flat to 6/12

1.0*

Over 11/12 to 12/12

4.0

Over 6/12 to 7/12

1.25*

Over 12/12 to 14/12

5.0

Over 7/12 to 8/12

1.5*

Over 14/12 to 16/12

6.0

Over 8/12 to 9/12

2.0*

Over 16/12 to 18/12

7.0

Over 9/12 to 10/12

2.5

Over 18/12 to 20/12

7.5

Over 10/12 to 11/12

3.25

Over 20/12 to 21/12

8.0

* 3 ft. minimum in snow regions

Storm Collar

Roof

Flashing

6

6

Termination Locations

Fire Risk.

Maintain vent clearance to combustibles as
specifi ed.

DO NOT pack air space with insulation or other

materials.

Failure to keep insulation or other materials away
from vent pipe may cause overheating and fi re.

WARNING

Gas, Wood or Fuel Oil

Termination Cap

B

Gas

Termination

Cap **

A *

*

If using decorative cap cover(s), this distance may need to be
increased. Refer to the installation instructions supplied with the
decorative cap cover.

**

A

B

6 in. (minimum) up to 20 in.

152 mm/508 mm

18 in. minimum

457 mm

20 in. and over

0 in. minimum

In a staggered installation with both gas and wood or fuel oil
terminations, the wood or fuel oil termination cap must be
higher than the gas termination cap.

Figure 6.2

Multiple Termination Caps

Advertising