Heatiator Heatilator Evolution NEVO4236I NEVO3630I User Manual

Page 3

Advertising
background image

Heatilator • Evolution • 4065-114 Rev. o • 11/11

3

Safety Alert Key:

• DANGER!

Indicates a hazardous situation which, if not avoided will result in death or serious injury.

• WARNING!

Indicates a hazardous situation which, if not avoided could result in death or serious injury.

• CAUTION!

Indicates a hazardous situation which, if not avoided, could result in minor or moderate injury.

• NOTICE:

Used to address practices not related to personal injury.

Table of Contents

A. Congratulations

2

B. Limited Lifetime Warranty

5

1 Listing and Code Approvals

A. Appliance

Certifi cation

7

B. Tempered Glass Specifi cations

7

C. BTU

Specifi cations

7

D. High

Altitude

Installations

7

E. Non-Combustible Materials Specifi cation

7

F. Combustible Materials Specifi cation

7

G. Electrical

Codes

7

H. R e q u i r e m e n t s f o r t h e C o m m o n w e a l t h o f

Massachusetts 8

User Guide

2 Operating Instructions

A. Gas Fireplace Safety

9

B. Your

Fireplace

9

C. Fan Kit (optional)

10

D. Clear

Space

10

E. Decorative Doors and Fronts

10

F. Fixed

Glass

Assembly

10

G. Remote Controls, Wall Controls and Wall Switches 10
H. IPI Battery Tray/Battery Installation

11

I.

Control Module Operation

11

J. Before Lighting Fireplace

11

K. Lighting Instructions (IPI)

12

L. After Fireplace is Lit

13

M. Frequently Asked Questions

13

3 Maintenance and Service

A. Maintenance

Tasks-Homeowner

14

B. Maintenance

Tasks-Qualifi ed Service Technician 15

Installer Guide

4 Getting Started

A. Typical

Appliance

System

16

B. Design and Installation Considerations

17

C. Tools and Supplies Needed

17

D. Inspect Appliance and Components

17

5 Framing and Clearances

A. Select

Appliance

Location

18

B. Construct the Appliance Chase

19

C. Clearances

20

D. Mantel and Wall Projections

21

6 Termination Locations

A. Vent Termination Minimum Clearances

22

7 Vent Information and Diagrams

A. Approved

Pipe

24

B. Vent

Table

Key

24

C. Use of Elbows

24

D. Measuring

Standards

24

E. Vent

Diagrams

25

8 Vent Clearances and Framing

A. Pipe Clearances to Combustibles

35

B. Wall Penetration Framing

35

C. Install the Ceiling Firestop

36

D. Install Attic Insulation Shield

37

9 Appliance Preparation

A. Top

Vent

38

B. Rear

Vent

39

C. Secure and Level the Appliance

40

10 Install Vent Pipe

A. Assemble Vent Sections (DVP Only)

41

B. Assemble Vent Sections (SLP Only)

42

C. Assemble Slip Sections

42

D. Secure the Vent Sections

43

E. Disassemble Vent Sections

43

F. Install Decorative Ceiling Components
(SLP

only)

44

G. Install Metal Roof Flashing

45

H. Assemble and Install Storm Collar

45

I.

Install Vertical Termination Cap

46

J. Heat Shield Requirements for Horizontal
Termination

46

K. Install Horizontal Termination Cap

47

11 Shrouds

A. HHT

Shrouds

48

B. Field Constructed Shrouds

48

12 Gas Information

A. Fuel

Conversion

50

B. Gas

Pressure

50

C. Gas

Connection

50

D. High

Altitude

Installations

50

13 Electrical Information

A. Wiring

Requirements

51

B. IntelliFire Plus™ Ignition System Wiring

51

C. Optional

Accessories

Requirements

51

D. Electrical Service and Repair

52

E. Junction Box Installation

53

F. Wall Switch Installation for Fan (Optional)

53

Advertising