Venting, 8 installing through the ceiling – Harman PP38+ User Manual

Page 13

Advertising
background image

13

PP38+ Pellet Stove

3-90-08422R33_06/13

#8 installing through the ceiling

Through the ceiling vent, follow PL vent manufacturers

recommendations when using wall and ceiling pass through.

note: do not place joints within wall pass-throughs.

Fig. 14

PL vent manufacturer's

firestop spacer and support

(See Page 7 for

corner installation

clearances)

Minimum flue vent configuration

It is required that outside air

be installed with this venting

configuration to reduce smoke and

creosote smell in the room in the

event of power failure.

Min. above ground level

12"

Storm collar

Flashing

3" min.

3" min.

12" min.

3" min.

venting

Fig. 15

3" min.

No insulation or

other combustible

materials are allowed

within 3" of the pellet

vent pipe. Unless

specified by the pipe

manufacturer

Fig. 16

12"

min. wall to outlet

36"

min. clear

anc

e to an

y

combustable ma

terial

Advertising