Commissioning the switchgear

Installing and starting up the switchgear is an important event for the System Administrator. The
following steps must be followed when commissioning the switchgear.

• Step 1: Reset Passwords.

See

Passwords on page 13

.

• Step 2: Set User Settings.

See DEH-231 Entellisys Low Voltage Switchgear System User Manual.

• Step 3: Set Local HMI flags.

See

Local HMI on page 17

.

• Step 4: Set System Time Synchronization.

See

Time synchronization on page 19

.

• Step 5: Configure System for Remote Communications.

See

Configuring the switchgear for remote communications on page 21

.