Assembly – Grizzly G0695 User Manual

Page 18

Advertising
background image

-16-

model g0695 (mfg. since 9/10)

figure 8. machine mount example.

using Machine Mounts

Using machine mounts, shown in

figure 8, gives

the advantage of fast leveling and vibration reduc-
tion. the large size of the foot pads distributes
the weight of the machine to reduce strain on the
floor.

bolting to Concrete floors

anchor studs and lag shield anchors with lag
bolts (see

figure 7) are two popular methods for

anchoring an object to a concrete floor. We sug-
gest you research the many options and methods
for mounting your machine and choose the best
that fits your specific application.

figure 7. typical fasteners for mounting to

concrete floors.

anchor stud

Lag shield anchor & Bolt

Assembly

To assemble your mill:

1. secure the three handles to the handwheels

with the m6-1 x 25 cap screws, as shown in

figure 9.

2. Use the external retaining ring pliers to

remove the retaining ring from the end of the
vertical crank screw, reverse the crank han-
dle from its shipping position, then re-install
the retaining ring (see

figure 10).

figure 9. handle attached to handwheel.

handle

figure 10. Vertical crank handle properly

installed.

retaining ring

Advertising