5. connecting 25kw system cords and cables – Miller Electric IH User Manual

Page 14

Advertising
background image

OM-203 185 Page 10

4-5. Connecting 25kW System Cords And Cables

Connect the power output cable and

coolant lines as shown.
Connect 110-volt power cable as shown.
Plug the 110-volt cooler power cord into

the duplex at the rear of the power source

cart. On the 25kW system, the cooler must

be plugged into the right side duplex. This

is identified with a label that reads

“switched receptacle.” The ON-OFF

switch located to the left operates this

plug.
The IH/TS Control is plugged in the left

side duplex. Do not use these duplex

connections for operating auxiliary tools,

such as grinders, drills, lights, etc.
Connect output power cables to the output

connectors.

.

All coolant connections have 5/8-18
left-hand threads.

D Connect the “coolant out” line from

the cooler directly to the output ex-

tension cable.

D Connect the “coolant in” line on

the IH/TS directly to the remaining

output extension cable connection.

D Connect the “coolant out” line from

the IH/TS to the “coolant in” line on

the cooler.

803 036-C

Hose From

IH/TS To

Cooler

Blue

14-Pin

Control Cable

Hose

From Power

Source

To IH/TS

110 Volt From

IH/TS

110 Volt From

Cooler

Hose From Cooler To

Power Source

Output

Connectors

Yellow

Blue

Red

Yellow

Red

Front

Rear

Advertising
This manual is related to the following products:

TS