Motorola PTP 400 Series User Manual

Page 64

Advertising
background image

62

The following behavior should be noted:

When first started up and from time to time the Master unit will carry out a band scan to

determine which channels are not in use. During this time, between 10 and 15 seconds, the

Master unit will not transmit and as a consequence of this neither will the Slave unit. During

this time the installation tone on the master unit will drop back to the band scan state and the

Slave unit will drop back to Scanning state with the pitch of the tone set be the background

noise level. Alignment of the unit should cease during this time.

The master unit can take between 30 seconds in 0-5km (0-3 miles) mode to 300 seconds in

0-200km (0-124 miles) mode to determine the range of the link being installed

14

. The Master

unit will remain in the Scanning state until the range of the link has been established. The

Master unit will only move to the Synchronized state when the range of the link has been

established.

If at the end of the ranging period the ‘Registered’ state is not achieved due to interference or

other reasons, the Master unit will retry twice more on the same channel before moving to

another available channel. Should this occur it might take a number of minutes to establish a

link in the ‘Registered’ state.

The Slave unit does not have a ranging process. The slave unit will change to the

Synchronized state as soon as the wanted signal is demodulated.

When the alignment process is complete the installer MUST REMEMBER TO DISARM BOTH

UNITS in the link as described in section 8.3.5. This is necessary for the following:

• Turn off audible alignment aid.
• Enable Adaptive Modulation
• Fully enable Dynamic Frequency Selection
• Clear unwanted installation information from the various systems statistics
• Store the link range for fast link acquisition on link drop
• Enable Higher Data Rates

14

If the unit is operating where mandatory radar avoidance algorithms are implemented the ranging

behavior for the 400 Series Bridge may be affected. The Master has to monitor the initially chosen

channel for 60 seconds to make sure it is clear of radar signals before transmitting. If radar is

detected during any of the installation phases a further compulsory 60 seconds channel scan will take

place as the master unit attempts to locate a new channel that is free of radar interference.

Advertising