Warning, Install main circuit breaker – Maxon Telecom WL7-VERS. C User Manual

Page 29

Advertising
background image

PATENTS PENDING

29

11921 Slauson

A

ve. Santa Fe Springs, CA. 90670 (800) 227-41

16 F

AX (888) 771-7713

To prevent personal injury and equipment damage, make sure power is discon-
nected from Lift when installing electrical parts.

WARNING

!

NOTE: Apply dielectric grease on all electrical connections after all electrical cables are
connected.

INSTALL MAIN CIRCUIT BREAKER

1. Attach 90 amp main circuit breaker (Kit item) to

vehicle so power cable (Kit item) is within reach
of the battery, as follows. Find a place to attach
bracket (FIG. 29-1). (Note: The power cable must
be able to reach between 90 amp circuit breaker
and (+) battery terminal without straining the con-
nections.) Attach 90 amp circuit breaker to brack-
et. Next, attach bracket to vehicle with four (4) #12
self-drilling screws (Kit items).

MAIN CIRCUIT BREAKER & CABLING

FIG. 29-1

1/4”-20

LOCK NUT

(2 PLACES)

1/4” FLAT

WASHER

(2 PLACES)

BATTERY

2 AWG POWER

CABLE (SHORT CABLE)

2 AWG POWER CABLE
(LONG CABLE CONNECTED
BETWEEN TERMINAL OF
STARTER SOLENOID AND MAIN
CIRCUIT BREAKER)

#12 SELF-DRILLING
SCREW (4 PLACES)

90 AMP MAIN

CIRCUIT BREAKER

1/4”-20

CAP SCREW

(2 PLACES)

POWER UNIT

(REF)

Advertising
This manual is related to the following products: