2 module connection example, 9 maintenance and inspection, Melsec-a – MITSUBISHI ELECTRIC AJ65SBT-64AD User Manual

Page 40: Point

Advertising
background image

4 - 9

MELSEC-A

4 SETUP AND PREPARATION BEFORE OPERATION

4.8.2 Module connection example

V+

I+

COM

SLD

V+

I+

COM

SLD

FG1

CH1

+15V

-15V

GND

*4

*1 Shield

*5

*3

CH4

*2

AG

For voltage input

For current input

Signal source 0 to ±10 V

Signal source 0 to ±20mA

*1 Shield

500k

500k

500k

500k

250

250

*1 Use a two-core twisted shield line for the power cable.

*2 Indicates the AJ65SBT-64AD input resistor.

*3 For the current input, be sure to connect the (V+) and (I+) terminals.

*4 When noise or ripple occurs with the external cable, connect a condenser with

about 0.1 to 0.47µF (25V or higher voltage-resistant product) between the terminal

V and COM.

*5 Always perform grounding for FG1. When there is a lot of noise, it may be better

ground AG as well.

If the grounding wiring (grounding yes/no) is changed after the offset and gain are

set, perform the setting of the offset/gain values again.

POINT

A/D conversion values are fluctuated by self-heating within approx. 30 minutes after

power is turned ON.

4.9 Maintenance and Inspection

There are no special inspection items for the AJ65SBT-64AD module, but follow the

inspections items describes in the PLC CPU User's Manual so that the system can

always be used in the best condition.

Advertising