Miller Electric Spectrum 1250R User Manual

Page 23

Advertising
background image

OM-217 Page 19

3-10. Placing Jumper Links And Connecting Input Power

Ref. ST-800 718

Check input voltage available at
site.

1

Jumper Link Label

Check label – only one is on unit.

2

Jumper Links

Move jumper links to match input
voltage.

3

Input And Grounding
Conductors

Select size and length using Sec-
tion 3-9.

4

Line Disconnect Device

Select type and size of overcurrent
protection using Section 3-9.

Reinstall side panel.

Y

Special installation may be
required where gasoline or
volatile liquids are present –
see NEC Article 511 or CEC
Section 20.

Tools Needed:

4

230 VOLTS

S-012 242-A

L1

L2

L3

460 VOLTS

L1

L2

L3

575 VOLTS

L1

L2

L3

1

200 VOLTS

S-031 770-A

L1

L2

L3

230 VOLTS

L1

L2

L3

460 VOLTS

L1

L2

L3

L1 (U)

L2 (V)

GND/PE
Earth Ground

L3 (W)

Connect GND/PE
Conductor First

3/8, 7/12, 1/2 in

L3 (W)

2

Connect GND/PE
Conductor First

L1 (U) L2 (V)

3

1

220 VOLTS

S-151 770

L1

L2

L3

380 VOLTS

L1

L2

L3

415 VOLTS

L1

L2

L3

Advertising