OM-217 Page 31

7-3.

Correct Installation

A. Worksite Requirements

1

Plasma Arc Cutting Source

Ground metal machine case, line disconnect
device, input supply, and workpiece (if
required).

2

Center Point Of Cutting Zone

Midpoint between high-frequency source
and cutting torch.

3

Cutting Zone

A circle 50 ft (15 m) from center point in all
directions.

4

Torch And Work Cables

Keep cables close together.

5

Conduit Joint Bonding And Grounding

Electrically join (bond) all conduit sections
using copper straps or braided wire. Ground
conduit every 50 ft (15 m).

6

Water Pipes And Fixtures

Ground water pipes every 50 ft (15 m).

7

External Power Or Telephone Lines

Locate high-frequency source at least 50 ft
(15 m) away from power and phone lines.

8

Grounding Rod

Consult the National Electrical Code for
specifications.

Metal Building Requirements

9

Metal Building Panel Bonding Methods

Bolt or weld building panels together, install
copper straps or braided wire across seams,
and ground frame.

10 Windows And Doorways

Cover all windows and doorways with
grounded copper screen of not more than
1/4 in (6.4 mm) mesh.

11 Overhead Door Track

Ground the track.

Ref. S-0755

1

2

3

50 ft

(15 m)

4

7

50 ft

(15 m)

8

8

5

6

Ground

Workpiece

If Required

By Codes

Ground All

Metal Objects

And All Wiring

In Cutting Zone

Using #12 AWG

Wire

Cutting Zone

Nonmetal Building

9

8

11

10

Metal Building

8

Advertising