Powering on the system, Power-on sequence, Powering on the system - 23 – Motorola CAJUN P880 User Manual

Page 33: Power-on sequence - 23

Advertising
background image

Cajun P880 Routing Switch Installation Guide

1 - 23

Powering On the System

To power on the system:

1. Check all connections.

2. Turn on the power supplies by pushing the ON (—) switch for

each supply. (ON is indicated by “—” and OFF is indicated by
“O”.)

Power-On Sequence

As the system powers on:

Cajun v4.1.x

(or later version) displays on the 8-character

LED display on the front panel of the switch.

On properly functioning modules, Port LEDs will cycle from
yellow to normal operating status as the system continues
through its power-on diagnostics.

When the system has completed running its internal diagnostics, the
8-character LED display should read:

Cajun v4.1.x

(or later version)

The LEDs should function as described in "Interpreting Front Panel
LED Displays" in the Cajun P550/P220 Switch Operation Guide. In
general, you will observe the following on properly functioning
modules (Table6):

Table 6. Power-up LED Function

Module

LED

Normal Behavior

All Modules

Module
Status

Solid green, indicating normal
operation.

Gigabit
Modules

TX and RX

Solid green, flashing yellow
intermittently to indicate traffic.

Port

Solid green, indicating link integrity.

HD/FD

Solid green, indicating full-duplex
operation.

10/100
Modules

Port

Solid green, flashing yellow
intermittently to indicate traffic.

Advertising