Setting the pad pcb – Matsushita CF-30 User Manual

Page 43

Advertising
background image

9-21

9.2.11. Setting the PAD PCB

1. Fix the PAD PCB using the 2 Screws. <N4>
2. Attach the TP PCB Screw Sheet.
3. Connect the Cable to the Connector. (CN802)
4. Connect the Cable to the Connector (CN801) and attach

the Tape.

Screws <N4>: DRQT26+D3FKL

Q

Assembly of PAD PCB

<N4>

<N4>

Pad PCB

Connector

(CN802)

Connector

(CN801)

Tape

TP PCB Screw Sheet

Safety Working

Safety Working

Safety Working

Safety Working

Safety Working

Safety Working

Attach the
Cable Sheet

0 2

LED PCB

Attach the Touch Pad INS Sheet

0 2

7 11

7 11

0 2

0 2

FFC Insertion

FFC Insertion

Attach the Touch
Pad FFC Fix Tape

Tighten of
Screw

Tighten of
Screw

Attach the Touch Pad
PCB Screw Sheet

Cable Hold Sheet
is installed

* Notes:

1. Apply the load when attaching the parts. 20N to 30N (2 to 3Kgf)/cm2

Avoid running over the boss and the rib.

Process the surplus
of FFC to the back.

Screw

Screw

Insert the boss at an angle to put here close to the Cabinet side.

Process the SP cable between the bosses.

PCB Pad is set

Attach the Tape

Fit to the Cabinet line.

Attach the Tape

Fit to the Cabinet line.

Process the wire targeting the boss.

Do not insert the Connector at an angle.

Order of fixing

PCB Pad

CN Connection After connecting, add the kapton tape.

Advertising