Preparing for operation – Stinger MC POWER SYSTEM MC2 User Manual

Page 18

Advertising
background image

Chapter 2: 26 Amp-Hour Series

MC

2

Power Systems User's Guide

Preparing For Operation

Parts Listing (Fig 7)

• (1) Electronic Enclosure (A)
• (1) Battery Enclosure (B)
• (1) Cord Set (Fig 10 and 11)

1

Unpack the unit carefully and inspect it for damage. There will be two parts -
Electronic Enclosure and Battery Enclosure. WARNING: Battery enclosure is
HEAVY!

1110227 Revision 2

6

November

2006















Electronic Enclosure (A)

Battery Enclosure (B)

Fig 7: MC

2

Power System Parts

2

Connect electronic enclosure (A) and battery enclosure (B) at docking connector (Fig
8).

Docking Connector 2

Docking Connector 1

Battery Enclosure (B)

Electronic Enclosure (A)

Fig 8: Docking Connection

3

Install security screws (C) with security wrench (included).

Advertising