SpectraLink Link 150 M3 MCU User Manual

Page 29

Advertising
background image

SpectraLink Corporation

Installation and Operation

Link WTS – Link 150 M3 MCU

Mount Base Stations On Finished Ceilings
If your site does not have a dropped tile ceiling, the Base Station can be mounted to
a finished ceiling or wall with a 4 to 5” long 1/4” –20 TPI plastic or nylon screw or
bolt (such as a lag screw).



The customer’s wire contractor is responsible for this installation.

1. Drill two holes approximately 1” apart. Make the holes large enough to

accommodate the RJ-45 connector and a bolt to secure the Base Station.

2. Insert a wide washer above the ceiling, then screw the bolt into the beam or

ceiling.

3. Insert three nuts on the bolt, then screw the Base Station into the bolt, being

careful not to insert the bolt more than 1/3”, five full turns, into the Base
Station.

4. If the ceiling is open with I-beams or pipe construction, mount the Base Station

with I-beam clamps or pipe clamps.

PN: 72-0075-01-F.doc

Page 29

Advertising