2.1 Installation Steps and Responsibilities

9

Task

Description

Wire

Contractor or

Electrician

Field

Service

Engineer

Customer

Project Mgr/

System Admin

Site

Preparation

Determine location of MCU

9

Run Cable for System

Run cable to Base Station locations

9

Pull

cable

9

Terminate cable at Base Station locations

9

Prepare and install demarc blocks

9

Assign and program ports

9

Connect cables to demarc blocks

9

Install SpectraLink System

Survey site and check components

9

Install

MCUs

9

Install Base Stations

9

Install outdoor Base Stations

9

Connect and register handsets

9

Set up diagnostic modem

9

Register

handsets

9

Program

handset

features

9

Test

handsets

9

Site

certification

9