SMC Networks Sunny Mini Central SMC 5000A User Manual

Page 64

Advertising
background image

Troubleshooting / Problem Solving

SMA

Technologie AG

Page 64

SMC50A_60A-IEN073320

Installation Guide

3

Repeat points 3 and 4 for each string.

Event

Measure

You have found a

ground

fault.

Restart the Sunny Mini Central as described
from step 7 onwards, but without
reconnecting the faulty string. The PV
generator's installation engineer has to fix the
ground fault before you can reconnect this
string.

You have found

no ground

fault.

It is likely that one of the thermally monitored
varistors is defective. In this case, proceed as
described in section 11.2.2 "Checking the
Varistors" (Page 65).

4

Commission the Sunny Mini Central as described in section 10.3 "Closing of
the Sunny Mini Central" (Page 60).

5

Check whether the display or the LEDs on
the Sunny Mini Central indicate that the
device is functioning correctly (see section 8
"Commissioning the Sunny Mini Central"
(Page 51)).

Step

Instruction

Advertising
This manual is related to the following products: