Unpacking instructions- integration packaging, Figure 9, Figure 10 – SharkRack 45U User Manual

Page 12

Advertising
background image

SharkRack Enclosure Installation Guide

ID-00210-000

REV D, ECO2773

Page 12 of 46

Unpacking Instructions- Integration Packaging

Step Detail

WARNING: A fully loaded cabinet is very
heavy. Take proper precautions when moving
the cabinet

Note: Unpacking of a cabinet requires at least two
people.

There must be at least 13 feet of clear area in front of
the loaded crate to unload the cabinet.

1. Open the Crate. Loosen the (6) clips securing the

front of the crate. The front of the crate is used as a
ramp to unload the cabinet.

Figure 9

Shipping Crate Shown for 42U X 37DP Cabinet

2. Position the loading ramp onto the front of the crate.

3. Remove the (2) wing nuts securing the piece of wood

at the base of the cabinet.

4. Remove the (4) bolts securing the front Floor

Mounting Bracket to the crate and cabinet.

Figure 10

Shipping Crate with 42U X 37DP Cabinet Shown

#3

#4

Advertising
This manual is related to the following products:

37U, 42U