SharkRack 45U User Manual

Page 31

Advertising
background image

SharkRack Enclosure Installation Guide

ID-00210-000

REV D, ECO2773

Page 31 of 46

Installing a Typical 19 inch EIA Power Strip (cont.)

Step Detail

3. Secure to the SharkTRAC™ using screws

3a. Install 10-32 cage nuts. The SharkTRAC™ requires the

use of cage nuts; install them into the appropriate holes
using the method shown.

Figure 34

Cage Nut instillation

3b. (As required) Adjust the mounting brackets orientation.

Remove the hardware from the brackets as required.
Rotate the mounting brackets as required. Reinstall the
hardware.

Figure 35

Mounting Bracket

3c. Secure the strip using (6) 10-32 x 1/2 inch panhead

screws.

3d. Connect necessary cables.

Figure 36

PDU installation