Installing a Grounding Kit

Step Detail

Grounding points are provided on the various cabinet
components so that each component can be electrically
bonded to the frame.

Detail A:

Shows how to route the grounding cables through the
frame of the cabinet. Connection (1) attaches to either of
the door assemblies. Connection (2) attaches to the side
panel

Detail B:

Shows where connection (2) attaches to the corner of the
Side Panel

Detail C:

Shows how to route the grounding cable to the top panel.

Detail D:

Shows the door grounding cable being routed through the
face of the corner post (reverse side of Detail A).

Figure 27

Grounding Points

42U X 37DP Cabinet Shown