SharkRack Enclosure Installation Guide

ID-00210-000

REV D, ECO2773

Page 6 of 46

Chapter 1 Site Preparation

Check Facility Provisions

Ensure that the following conditions are met:

• Floor is level and of sufficient strength to support the rack and your equipment. At

maximum gross weight, the floor must be able to support 1000 lb/in

2

.

• A qualified professional should complete site electrical power supply set-up. Ensure the

types of outlets are consistent with the type of plugs on the power devices to be used.

• Check with a qualified HVAC technician to make sure the environment will support the

heat load of the products being installed in the cabinet.

• Select a location for the cabinet that will allow adequate space for the door to open freely

and slide-mounted equipment to be extended.

• Check that the site can accommodate the cabinet footprint and mounting locations

according to the illustrations in Figure 3 and Figure 4.