Air purging and leakage test – Sunrise Global 13-05024 User Manual

Page 21

Advertising
background image

20

AIR PURGING AND LEAKAGE TEST

1. Take out the nut cover of the inlet for

refrigerant.

2. Connect the tube of the vacuum watch

with the vacuum pump, having the low-
pressure end linking to the inlet for refri-
gerant.

3. Starting the vacuum pump, when the

indicator turns to -1 bar, closing the low
pressure handle and stopping vacuu-
mize. Keep for 15 minutes, ensuring the
pressure of the vacuum watch remains.

4. Take out the valve cover of the gas

valve and also the one for the liquid
valve.

5. Loosing the cord of liquid valve until the

pressure rise to 0 bar.

6. Dismantle the tube from the cover of the

inlet for refrigerant then, tighten the
cover.

7. Loose the valve cord of the gas valve as

well as the liquid valve entirely.

8. Tighten the valve cover of the gas valve

and liquid valve so as to check whether
leakage occurred.

Outdoor condensation drainage

When the unit is cooling or defrosting, the
waste water formed in the outdoor unit can
be drained out reliably through the drain
hose.

Installation:
Install the outdoor drain elbow in the

25 mm (1”) hole on the base plate as

shown in Fig.8, and joint the drain hose to
the elbow, so that the waste water formed
in the outdoor unit can be drained out to a
proper place.

Pressure gauge

Nut

Liquid
pipe

Gas
pipe

Vacuum pump

Base plate

Outdoor drain
elbow

Advertising
This manual is related to the following products: