Sub-Zero Sub-Zero User Manual

Page 18

Advertising
background image

18

A N T I - T I P B L O C K I N G K I T

To prevent the unit from tipping forward and to

provide a stable installation, the unit must be

secured in place with an anti-tip blocking kit. If

there is a solid soffit above the unit with clear-

ance between the unit and the soffit of 25 mm

or less, you won‘t need to block the unit. But for

installations with clearances of more than 25

mm, you must block the unit with the anti-tip

blocking kit (wood block and hardware) provided

with each Sub-Zero Built-In model. Refer to the

Built-In Installation Guide packed with the appli-

ance, which provides step-by-step procedures

for making sure the unit is installed properly.

A D D I N G P A N E L S

In your plan for panels, be sure you are working

with the Sub-Zero panel design family called for

in your design. If you have chosen the stainless

steel design, the unit will be shipped complete

with wrapped stainless steel doors and handle

hardware. You will not have to install door

panels.

Specifications on the following pages provide

panel dimensions and installation considerations

for overlay door panels.

Side panels can be used with the overlay and

stainless steel design applications. Refer to

specifications on page 20.

A C C E S S O R I E S

Optional accessories
are available
through your
Sub-Zero dealer.

Advertising