2 - installation, 2installation – KVH Industries TracVision L2 User Manual

Page 15

Advertising
background image

2-1

Installation

54-0195 Rev. A

2

Installation

TracVision L2 is designed for simple installation and setup. Just
follow these easy steps:

Step

Refer to Section...

1.

Choose the antenna location

2.1

2.

Mount the antenna unit

2.2

3.

Connect the system components

2.3

4.

Activate the IRD

2.4

5.

Check out the system

2.5

Tools and Materials Required

Electric drill

3

16

"-drill bit and

3

4

" hole saw and auger bit

#2 Phillips and #0 flat tip screwdrivers

RG-6 or RG-11 (75 ohms) RF cable (if installing
two RF cables - refer to

Section 2.3.2

for details)

Silicone sealant or RTV

7

16

"-open end wrench

Adhesive suitable for specific roof construction
and materials (e.g., Liquid Nails)

Rivet gun and

3

16

"-rivets (or other fastener suitable

for specific roof construction)

(Recommended) PC with terminal emulation
software such as PROCOMM or Windows
Terminal or Hyperterminal and a DB9 (male-to-
female) PC data cable

Plan the entire installation before
proceeding! Take into account
component placement, cable
running distances between units,
and accessibility to the equipment
after installation.

While some DIRECTV IRDs
offer on-screen messages, it is
recommended that a PC be
available for all installations of
DIRECTV, EchoStar, and
ExpressVu.

Table 2-1
Installation Process

Advertising