1) pumping down – LG LCN240CP User Manual

Page 49

Advertising
background image

Service Manual 49

(3-way) Valve

Procedure

For pumping down,firstly short the Low Pressure
s/w at the outside and then operate below proce-
dure.
1. Confirm that both the gas side and liquid side

valves are set to the open position.

- Remove the valve stem caps and confirm that

the valve stems are in the raised position.

- Be sure to use a hexagonal wrench to operate

the valve stems.

2. Operate the unit for 10 to 15 minutes.

3. Stop operation and wait for 3 minutes, then con-

nect the manifold gauge to the service port of
the gas side valve.

- Connect the hose of the gauge with the push

pin to the service port.

4. Air purging of the charge hose.

- Open the Low-handle valve on the gauge

slightly to air purge from the hose.

5. Set the liquid side valve to the closed position.

6. Operate the air conditioner at the cooling cycle

and stop it when the gauge indicates 1kg/cm

2

g.

7. Immediately set the gas side valve to the closed

position.

- Do this quickly so that the gauge ends up indi-

cating 1kg/

g.

8. Disconnect the charge set, and mount the liquid

side and gas side valve caps and the service
port nut.

- Use torque wrench to tighten the service port

nut to a torque of 1.8kg.m.(4.2kg.m/5.5kg.m)

- Be sure to check for gas leakage.

• Be sure to short pressure S/W. otherwise Low pressure S/W detect low pressure skete and stops the compressor.

Lo

Closed

Purge the air

Outdoor unit

Indoor unit

Liquid side

Gas side

CLOSE

Open

3-Way
valve

3-Way
valve

CLOSE

(1) Pumping down

Advertising