A-16

INSTALLATION

LF-72

A-16

ALUMINUM WIRE PREPARATIONS

ELECTRIC SHOCK can kill.

• Turn the input power OFF at the dis-

connect switch before working on

this equipment.

• Do not touch electrically hot parts.

------------------------------------------------------------------------

Welding with aluminum filler wires requires extra care.

Aluminum wire is softer and not as stiff as steel wires,

it is important to keep aluminum wire free of dirt and

scratches. Limit gun length to 10 Ft.(3.0 m) for best

results and use a spool cover if feeding from a spool.

To prevent scratching of the aluminum wire, remove

the ball bearings from the ball housing as follows.

(For Codes 11075, 11076, 11077)

Tools required: (See Figure A.12a)

• Snap Ring Pliers

• 9/64" Hex key wrench

1. Turn off power at the welding power source.

2. Remove the snap ring holding the ball bushing

assembly to the back of the wire feeder. Remove

the ball bushing assembly.

FIGURE A.12a

(For Codes 11209, 11210, 11211 and above)

Tools required: (See Figure A.12b)

• 9/64" Hex key wrench

1. Turn off power at the welding power source.

2. Remove the snap ring holding the ball bushing

assembly to the back of the wire feeder. Remove

the ball bushing assembly.

FIGURE A.12b

3. Remove the three socket head cap screws from the

ball bushing assembly. Caution: as the screws

are being loosened, the balls may fall free from

the assembly.

Remove the balls and the steel

washer.

FIGURE A.13

4. Place the ball bushing housing into the wire feeder

case and secure with the snap ring or “O” ring

depending on which code your machine uses.