Check the panel dimensions
against the floor layout.
Apply a 3/8” diameter bead
of Premier Mastic along the
sides and down the center of
the bottom plate. Slide the
panel into position. Lift the
panel over the bottom plate
by using either manpower or
mechanical means. After the
panel is standing, check for proper placement.
Next, plumb the wall section in both directions
and fasten it to the plate and the adjacent
panel with the specified fasteners. If necessary,
brace the wall before moving to the next panel.

steP 4. adJaCent Panel

Move the next panel into position and apply
Premier Mastic in the same manner as with
the first panel. On this panel you will run
an additional 3/8” diameter bead of mastic
down the center of the foam-to-foam interface.
Place splines on the floor and run the Mastic
down one side and up the other, approximately
1/4” from the edge on the spline.