Pbs sips tips – Premier Floors User Manual

Page 4

Advertising
background image

4

PBs siPs tips

• Project must meet local code.

• Confirm your installation date at least two

weeks prior to requesting on-site assistance.

• Schedule a preconstruction meeting with

your installation crew (concrete, plumbing,
electrical, siding, roofing, etc.).

• Inventory materials when you receive them.

• Check all SIPs for proper cuts and recesses.

• Double check SIPs sizes and compare to

shop drawings before installation.

• Engineered details take prescedence over

PBS details.

• PBS details regarding mastic and SIPs tape

need to be followed.

• Any changes required at the job site should

be communicated with the technical
representative.

• Make sure your foundation or floor is level

and square.

• Fabricate and pre-install dimensional or I-joist

spline material as specified.

• Review engineering for hold downs if

applicable.

Advertising