Roberts Gorden Combat UHD[X][S][R] 75 User Manual

Page 30

Advertising
background image

UHD L

OW

P

ROFILE

D

UCT

F

URNACE

I

NSTALLATION

O

PERATION

AND

S

ERVICE

M

ANUAL

24

Figure 13: Automatic Burner Control Sequence

Figure 14: Gas Valve

Burner Sequence for Ignition Control

Flame Signal

Start Gas Valve

Ignition Spark

Thermostat 24 V

SHUT DOWN

RUN

START

ts = 10 Seconds

Signals Output By Control

Required Incoming Signals

Flue Blower

Pressure

Switch

P

C

NO

NC

30 Seconds Purge*

*Purge time begins at pressure switch change over.

30 Seconds Post

If at any stage the flame fails, the control will retry
for ignition. The control has four trials for ignition
before a one hour lockout.

½PSI

IN

C

ON

OFF

Regulator

Outlet
Pressure

Gas Inlet

Inlet Pressure

TOP VIEW

END VIEW

Description

Part Number

Gas Valve NG

90032505

Gas Valve LP

90032506

Advertising
This manual is related to the following products: